Railway Infrastructure

We adapt. We solve problems.

No fuss. Guaranteed.



Railway Infrastructure

We are highly experienced at working within the unique requirements of railway corridors.


Whether it is staging works during weekend closures, managing works in an operating train station or working adjacent to live overhead lines, we have a track record of delivering safely, on-time and to the highest standard.

With our QR-approved specialist equipment and certified team, we are a delivery partner who is ready to hit the ground running.


  • Civil and structural concrete for train station accessibility upgrades
  • Structural concrete elevator shafts across multiple platforms
  • Soil nail and shotcrete for railway batters
  • Rock nails and rock fall netting
  • Concrete platforms and stairs for upgraded train stations
  • Excavation and installation of bored piers,reinforcement and concrete installation
  • Concrete drainage and culvert construction
  • Train platform coping stone installation

Whether it is staging works during weekend closures, managing works in an operating train station or working adjacent to live overhead lines, we have a track record of delivering safely, on-time and to the highest standard.

With our QR-approved specialist equipment and certified team, we are a delivery partner who is ready to hit the ground running.



  • Civil and structural concrete for train station accessibility upgrades
  • Structural concrete elevator shafts across multiple platforms
  • Soil nail and shotcrete for railway batters
  • Rock nails and rock fall netting
  • Concrete platforms and stairs for upgraded train stations
  • Excavation and installation of bored piers,reinforcement and concrete installation
  • Concrete drainage and culvert construction
  • Train platform coping stone installation

We have a skilled workforce equipped with all required SARC, WET and RIW tickets. We currently complete works within the SEQ Region ranging from Gold Coast to Sunshine Coast and as far west as Charleville. We have 3 Queensland Rail Approved Excavators. 2 x 8 Tonne Kobelco (2021 Model) and 1 x 5 Tonne Kobelco (2020 Model). All machines have tilt hitches, are fully plumbed and can be supplied with Rockbreaker Attachments or Augers as required.

- Rock Drilling

- Soil Nailing

- Culvert Installation

- General Labour

- Structural Concrete Works

- Gabions Walls

- Micro-piles

- Piling

- Basic Demolition and removal of structures